Mining & Resources

Mining & Resources

Heavy haul, out-of-gauge and remote site logistics.

The Scenario

A Pilbara iron ore producer needs to move 20 tonne crusher liners from Shanghai to Port Hedland. The parts are over-dimensional, the mine is FIFO and equipment downtime costs $1.2M per day.

The Challenge

Mining logistics demands heavy haul capacity, port handling, charter options for urgent parts and absolute reliability. Downtime is measured in millions.

Our Approach

  • Break-bulk and flat-rack ocean bookings with on-wharf heavy lift
  • Charter air freight for AOG (aircraft-on-ground) and crusher wear parts
  • Heavy haul road transport with pilot vehicles and permits
  • Mine-site bonded storage and FIFO worker logistics
  • Quarterly rate reviews and capacity lock-in with carriers

Sample Route

Origin

Shanghai (CNSHA)

Destination

Port Hedland (AUPHE)

Mode

Ocean FCL 40ft flat-rack + heavy haul road

Transit

22–26 days port-to-port + 3 days road transport

Includes WA Main Roads heavy vehicle permits, two pilot vehicles and on-site crane lift.