Project Cargo & OOG

Project Cargo & OOG

Engineered transport for oversized and heavy-lift cargo.

The Scenario

A renewable energy developer is shipping 24 wind turbine nacelles from Hamburg to a wind farm near Warrnambool. Each nacelle is 70 tonnes and 7m long.

The Challenge

Project cargo demands engineered transport plans, specialised vessels, port handling and last-mile heavy haul — every leg is a custom solution.

Our Approach

  • Heavy-lift vessel charter or break-bulk bookings
  • Engineered lashing and sea-fastening plans
  • Route surveys and permit acquisition for over-dimensional road transport
  • On-site project managers at load and discharge ports
  • Coordination with crane operators and stevedoring partners

Sample Route

Origin

Hamburg (DEHAM)

Destination

Warrnambool (AUWMB)

Mode

Heavy-lift vessel + road transport with pilot vehicles

Transit

38–45 days vessel + 2 days road

Includes 6 axle modular trailer, two pilot vehicles, VicRoads permits and on-site project supervisor.